产品中心
Home > Product > Mechanical parts > Chromium molybdenum nickel alloy steel base for machinery

    Chromium molybdenum nickel alloy steel base for machinery

    China Chromium molybdenum nickel alloy steel base for machinery with High-Quality, Leading Chromium molybdenum nickel alloy steel base for machinery Manufacturers & Suppliers, find Chromium molybdenum nickel alloy steel base for machinery Factory & Exporters.
  • Category:
    Mechanical parts
  • Browse number:
    141
  • Release time:
    2024-04-12 12:24:24
  • Share:
  • INQUIRY

Product Description


Product name:

Chromium molybdenum nickel Alloy steel base for machinery

(Alloy steel base,Metal Alloys)

Casting unit weight:

0.005kg to 45kg(Capacity Range)

Dimensional tolerance:

ISO8062CT5~CT7(Casting); ISO2768mk(Machining)

Surface finish:

Ra6.3~Ra12.5(Casting); Ra0.6to Ra3.2(Machining)

Casting size range:

2mm to 15000mm

Manufacturing:

Casting, NC,CNC, Burnishing,Galvanizing, Spraying, Assembling,

Service:

OEM/ODM/Customized

Application:

Stainless Steel Pipe System,Water System, Petrolum System etc.Medicine, Food, Chemical Industry, Ships, Agriculture, Automobiles etc

Material standard:  

GB/DIN/JIS/BS/ASTM/Customized 304,316,316L,201,430,420,GS45,GS34CrMo4,ZG40Cr25Ni20,HD,HK,HP,ZG1Cr13,ZG2Cr13,ZG00Cr18Ni10,ZG0Cr18Ni9,ZG1Cr18Ni9,ZG0Cr18Ni12Mo2Ti,ZG1Cr18Ni12Mo2Ti,1.4401,1.4404,1.4301,1.4027,1.4306,1.4308,1.4312,1.4408,1.4581,1.7220,1.0446,1.4823,1.4837,1.4848,1.4857,SCS1,SCS13,SCS14,SCS22,SCH22,SC410,SCW480,CF3,CF8,CF8M,WCB,17-4PH,Tin bronze,aluminum bronze


Production process

01.jpg

Factory buildings & qualifications

01.jpg

01.jpg

Product Show

Metal Alloys

FAQ


1,When can I get the price?

The quotation shall provide detailed and complete information within 24 hours after receiving the inquiry. And solutions.

2,How long can you finish the sample?

It is usually completed in 3-5 weeks; Different products adjust the cycle.

3,How long can you finish the order?

After receiving the sample confirmation information, the casting time is usually 4-6 weeks; The finished product was added for another 2-3 weeks;

4,What are your strengths?

1)We have foundry workshop and machining workshop; 2)We have an independent quality inspection team and production process management team; 3)We can provide you with the drawing mapping, mold or product design and manufacturing, as well as the inspection and monitoring management of your products in China;

We welcome your inquiry and cooperation!

Baoding haoxu Electric Technology Co., Ltd

www.baodinghaoxu.com  info@baodinghaoxu.com


Related tags: Alloy steel base

Comment

(0)
*Captcha:

ONLINE MESSAGE

*Subject:
*E-mail:
Phone:
Address:
*Captcha:
Contact us
Contact Now
Brochure Download
Brochure of our company and main products.
Recommend

RELATED PRODUCTS

No search results found!